Security Report Summary
A
| Site: | https://lemms-software-solutions.com/lemmsproject101/index.php | ||
|---|---|---|---|
| IP Address: | 147.79.116.28 | ||
| Report Time: | 05 Jun 2026 21:59:44 UTC | ||
| Headers: |
|
||
| Warning: | Grade capped at A, please see warnings below. | ||
| Advanced: |
|
Warnings
| Content-Security-Policy | No valid directives found in policy. |
|---|
Raw Headers
| HTTP/2 | 200 |
|---|---|
| date | Fri, 05 Jun 2026 21:59:44 GMT |
| content-type | text/html; charset=UTF-8 |
| vary | Accept-Encoding |
| set-cookie | PHPSESSID=0eqfm71vn5krab1u5q6m8fpqe0; path=/; secure |
| expires | Thu, 19 Nov 1981 08:52:00 GMT |
| cache-control | no-store, no-cache, must-revalidate |
| pragma | no-cache |
| x-frame-options | SAMEORIGIN |
| x-content-type-options | nosniff |
| referrer-policy | strict-origin-when-cross-origin |
| content-security-policy | |
| content-encoding | gzip |
| platform | hostinger |
| panel | hpanel |
| strict-transport-security | max-age=31536000; includeSubDomains |
| permissions-policy | interest-cohort=() |
| server | hcdn |
| alt-svc | h3=":443"; ma=86400 |
| x-hcdn-request-id | 97acfe6ae65012c05441244fb9cda447-int-edge4 |
| x-hcdn-cache-status | DYNAMIC |
| x-hcdn-upstream-rt | 0.615 |
Upcoming Headers
| Cross-Origin-Embedder-Policy | Cross-Origin Embedder Policy allows a site to prevent assets being loaded that do not grant permission to load them via CORS or CORP. |
|---|---|
| Cross-Origin-Opener-Policy | Cross-Origin Opener Policy allows a site to opt-in to Cross-Origin Isolation in the browser. |
| Cross-Origin-Resource-Policy | Cross-Origin Resource Policy allows a resource owner to specify who can load the resource. |
Additional Information
| set-cookie | The 'httpOnly' flag is not set on this cookie. There is no Cookie Prefix on this cookie. This is not a SameSite Cookie. |
|---|---|
| x-frame-options | X-Frame-Options tells the browser whether you want to allow your site to be framed or not. By preventing a browser from framing your site you can defend against attacks like clickjacking. |
| x-content-type-options | X-Content-Type-Options stops a browser from trying to MIME-sniff the content type and forces it to stick with the declared content-type. The only valid value for this header is "X-Content-Type-Options: nosniff". |
| referrer-policy | Referrer Policy is a new header that allows a site to control how much information the browser includes with navigations away from a document and should be set by all sites. |
| content-security-policy | Content Security Policy is an effective measure to protect your site from XSS attacks. By whitelisting sources of approved content, you can prevent the browser from loading malicious assets. Analyse this policy in more detail. You can sign up for a free account on Report URI to collect reports about problems on your site. |
| strict-transport-security | HTTP Strict Transport Security is an excellent feature to support on your site and strengthens your implementation of TLS by getting the User Agent to enforce the use of HTTPS. |
| permissions-policy | Permissions Policy is a new header that allows a site to control which features and APIs can be used in the browser. |
| server | Server value has been changed. Typically you will see values like "Microsoft-IIS/8.0" or "nginx 1.7.2". |